What happens if building inspection fails: steps to take after a failed building inspection

What happens if a building inspection fails? In Sydney, a pre-purchase building inspection reports the home's condition rather than giving a pass or a mark, so this usually means the report found significant defects. You then work through it in order: understand the report, prioritise the items, get advice from the right trades and specialists, budget and plan the repairs, have the work done, book a re-inspection and keep up maintenance. Buyers can also use the report to negotiate, ask for repairs or reconsider the purchase.

What happens if a building inspection fails?

The answer depends on which inspection it was and whether you're buying, selling or building:

  • Buying: a pre-purchase report with significant defects gives you information to act on. You can get quotes, negotiate the price, ask the seller to complete repairs before settlement, or reconsider the purchase. On a private sale in NSW, the cooling-off period is 5 business days from exchange, and a buyer who withdraws during it generally forfeits 0.25% of the purchase price. The NSW Government's page on contracts and deposits sets out the rules, and your conveyancer can advise on your contract.
  • Selling: a pre-sale report gives you time to fix items before listing, or to price the home with the findings in mind.
  • Building or renovating: if a stage inspection finds items that differ from the plans or the standards, the builder rectifies them and the work is checked again before the next stage.

These contract points are general guidance from the inspection side, and your conveyancer or solicitor is the right person for legal questions.

1. Understand the inspection report

Start by reading the report carefully. Most building reports separate significant (major) defects, minor defects and safety items, and include photos of each. Focus on:

  • Structure: cracking, movement, sagging or settlement in walls, floors and the roof frame.
  • Water: roof leaks, leaking showers, damp walls and subfloors, and poor site drainage.
  • Timber pests: termite damage or activity, and the conditions that attract termites.
  • Safety items: loose balustrades, uneven stairs, trip hazards and smoke alarms.
  • Services: a building inspection is visual, so the report recommends a licensed electrician or plumber where wiring or plumbing needs checking.

If anything is unclear, ask. Your inspector walks you through the findings and answers your questions about the report, so you understand how significant each item is and what it's likely to involve. The sample building and pest inspection report shows how findings are set out.

2. Prioritise the issues

Items in a report vary in urgency. Sort them by:

  • Safety: anything that could injure someone comes first.
  • Water: leaks and damp get worse over time and lead to mould, decay and termites, so they come next.
  • Structure: cracking or movement that needs a structural engineer's opinion.
  • Compliance: for new or renovated work, items that need bringing into line with the plans, the building code or the standards.
  • Maintenance and cosmetic items: these can be planned into a longer schedule.

A simple list grouped by urgency makes the next steps much clearer.

3. Consult with experts

Match each item to the right professional:

  • Licensed builder: for general building repairs, and to quote on a group of items.
  • Structural engineer: for significant cracking, movement or structural alterations.
  • Plumber or waterproofer: for leaks, wet areas and drainage.
  • Roofer: for roof coverings, flashings and gutters.
  • Electrician: for wiring, switchboards and smoke alarms that are hardwired.
  • Pest management technician: licensed by the NSW EPA, for termite treatment.

Getting 2 or 3 written quotes for the larger items gives you a clear idea of cost and the best approach.

4. Plan and budget for repairs

With quotes in hand, build a plan:

  • Scope of work: what each trade will do, in what order.
  • Timeline: water and safety items first, with each stage finished before the next begins.
  • Budget: the cost of each item, plus a contingency for anything uncovered once work starts.

If you're buying, this is the information you use to negotiate before exchange or during the cooling-off period. The guide to using a report to negotiate the price explains how.

5. Execute the repairs

When the work goes ahead:

  • Use licensed trades: check each contractor's licence and ask for references.
  • Put it in writing: get a written contract or quote that describes the work and the price.
  • Keep records: receipts, contracts, warranties and before and after photos.
  • Check progress: visit regularly, and ask questions while the work is still open.

Good records help if you sell later, and if you need to raise an item with a contractor.

6. Schedule a re-inspection

Once the repairs are complete, an independent check confirms each item was done properly. A building defects report from Vital can check the completed work item by item, with photos, and gives you a dated record of the property's condition. For a home you're buying, it confirms the seller's repairs before settlement. For a home you're selling, it gives buyers confidence.

A moisture meter held against a timber beam to check a repaired area is drying out, 1 of the checks that follow when you find out what happens if a building inspection fails

7. Review preventative measures

Regular maintenance keeps a home in good condition between inspections:

  • clean gutters and downpipes each autumn, and keep drainage flowing away from the house
  • reseal wet areas when silicone or grout starts to crack
  • check the roof and roof space after heavy storms
  • keep garden beds below the weep holes and clear of the slab edge
  • book a termite inspection every 12 months, and more often where termites have been active
  • have gas, electrical and smoke alarm checks done by licensed trades on schedule

The common building defects list shows what to watch for as a home ages.

Take control of your property's future

A report with significant defects is information you can act on. Working through it step by step, from understanding the findings to a re-inspection, turns it into a clear plan for the property. Vital's own experienced inspectors carry out every inspection in-house, and Vital is based in Stanhope Gardens, inspecting homes across north-western and south-western Sydney. Book a building and pest inspection online, or read more in the building and pest inspection guides.

Frequently asked questions

What does it mean when a building inspection finds major defects?

A pre-purchase building inspection reports the home's condition rather than giving a pass or a mark out of 10. Major defects are items significant enough to need attention soon, such as structural cracking, roof leaks or a leaking shower. The report explains each one, so you can get quotes and decide what to do next.

Can I pull out of a purchase after a bad building report?

On a private sale in NSW, the cooling-off period is 5 business days from exchange, and a buyer who withdraws during it generally forfeits 0.25% of the purchase price. There's no cooling-off period at auction, so inspect before auction day. Your conveyancer or solicitor can advise on your contract and options.

Does the seller have to fix defects found in the building inspection?

It depends on the contract and what you negotiate. Many buyers use the report and repair quotes to ask for a lower price, or ask the seller to complete specific repairs before settlement. Your conveyancer or solicitor can advise on how to make the request and put any agreement in writing.

Who should I call to fix defects in the report?

Match the trade to the item: a licensed builder for general building work, a structural engineer for significant cracking or movement, a plumber or waterproofer for leaks, a roofer for the roof, an electrician for wiring, and a pest management technician licensed by the NSW EPA for termites. Get written quotes and check licences.

Should I get a re-inspection after repairs?

Yes, it's worth it. An independent check after the work confirms each item was completed properly, and gives you a dated record with photos. A building defects report from Vital can check the completed work item by item, and it's useful evidence if you need to raise an item with the builder later.